CAROUSEL REBUILDING PROCESS
1.  Industrial Cleaning Of Structural Frame Including
2.  Detailed inspection and testing of all mechanical components to confirm proper functioning
3.  Detailed inspection, testing and re-calibration of electrical and electronic components to confirm functioning
4.  Replace or Rebuild Worn Parts
5.  Repaint Track, Frame and Drives, Re-grease Track, Re-skid
6.  Supply New Wearable Components
  • Provide all new bin fastener and installation hardware
7.  Supply New Wiring Cut To Length (Optional)
  • Cable type(s), lengths, pin/head types, head installation preference (on/off) as specified by customer
8.  Warranty And Customer Responsibilities
  • Limited warranty on all components, parts only, subject to return authorization and inspection by T-AS/R, sent to customer FOB Coal City, IL.  Warranty excludes cosmetic paint scratching on shelves, backs and bin sides.
  • Customer/Installer responsible for local permits and: primary power hookup to units, final "in field" track sizing, motor taching, floor levelness and/or shims and grouting
header8.jpg Contact Us Instantly
Since 1991, AS/R has perfected the carousel rebuilding process to provide an end product that functions like new.  The staff at AS/R takes pride in knowing that each component is thoroughly cleaned, inspected and rebuilt to meet our high quality standards.  Take a closer look at AS/R's rebuilding process.
Rebuilt Motors
Rebuilt Electronics
Rebuilt Gearbox
Bottom Plates Ready to Ship
Rebuilding process 1 (Rebuilt Motors).jpg img/Rebuilding process 2 (Rebuilt Electronics).jpg Rebuilding Process 3 (Rebuilt Gearbox).jpgRebuilding Process 4 (Bottom Plates Ready to Ship).jpg